Return to Home Historical Trends > Interpret

Interpretation of Historical Trends Data

Historical Trends (2000-2018)

Incidence, New Jersey, All Cancer Sites, White Hispanic, All Ages, Both Sexes

Incidence, New Jersey, All Cancer Sites, White Hispanic, All Ages, Both Sexes

Line graph with 19 years and 4 segments
During 2000-2004, the APC1 in the rate of cancer was stable: 0.5 with a 95% confidence interval from -1.3 to 2.4.
During 2004-2010, the APC1 in the rate of cancer was falling: -2.4 with a 95% confidence interval from -3.5 to -1.2.
During 2010-2016, the APC1 in the rate of cancer was stable: 0.2 with a 95% confidence interval from -0.9 to 1.2.
During 2016-2018, the APC1 in the rate of cancer was falling: -5.2 with a 95% confidence interval from -9.2 to -1.0.
Yearly points:
In 2000, the observed rate was 463.4. The estimated rate was 462.2.
In 2001, the observed rate was 464.1. The estimated rate was 464.6.
In 2002, the observed rate was 473.1. The estimated rate was 467.1.
In 2003, the observed rate was 455.1. The estimated rate was 469.6.
In 2004, the observed rate was 489.1. The estimated rate was 472.1.
In 2005, the observed rate was 457.5. The estimated rate was 460.9.
In 2006, the observed rate was 448.0. The estimated rate was 450.0.
In 2007, the observed rate was 426.2. The estimated rate was 439.3.
In 2008, the observed rate was 435.7. The estimated rate was 428.9.
In 2009, the observed rate was 417.9. The estimated rate was 418.7.
In 2010, the observed rate was 409.9. The estimated rate was 408.8.
In 2011, the observed rate was 407.6. The estimated rate was 409.5.
In 2012, the observed rate was 416.7. The estimated rate was 410.1.
In 2013, the observed rate was 411.4. The estimated rate was 410.8.
In 2014, the observed rate was 406.3. The estimated rate was 411.4.
In 2015, the observed rate was 413.6. The estimated rate was 412.1.
In 2016, the observed rate was 412.8. The estimated rate was 412.8.
In 2017, the observed rate was 391.3. The estimated rate was 391.2.
In 2018, the observed rate was 370.8. The estimated rate was 370.9.

Notes: